|
Procedure
The
client will recieve an on-site consultation free of charge and in
some cases, initial consultation with the planners from the local
district council.
We will arrange a survey, if required, to measure the site, ground
levels, plot trees and footprints of any existing buildings, etc.
We are mindful of the understanding so far of the project, the client's
instructions and any planning implications. We will then quote you
a fixed fee for the design service.
Stephen Mattick will begin his design and the client will be involved
at all stages.
When
the client is happy with the design, we will submit the application
and monitor and advise on progress throughout the planning process.
(The client will be charged separately for the Council's planning
fee.)
Once planning permission is achieved (this can take upwards of 8
weeks) building regulation approval will be required before building
begins. We can arrange for the building regulations (technical drawings)
to be drawn and submitted to the council for building regulation
approval. These are to staisfy the local authority as to the construction
of the building and from them a builder will be able to give a quotation.
Their preparation may involve the service of a structural engineer.
|